Justice Center - Multnomah County Detention Center (MCDC)

Multnomah County building detail.

Justice Center - Multnomah County Detention Center (MCDC)

Building ID: 119

1120 SW 3rd Ave | Portland, OR 97204-2828

Contact:

Active Building PM

0

Areas

6

Pumps

22

Completed Building Records

0

Areas

Pumps: 2 Order: 3

System has expansion tank (no info)

Pumps: 1 Order: 6

Cooling Tower Evapco

Pumps: 3 Order: 7

Building PM Schedules

No building-level schedules are on file.

Pumps

B-B-24

Grundfos | CR5-9 A-B-A-E-HQQE | Fire Booster Area: Mechanical Room A-13 - L1 Mechanical Location not set | Serial: A-99916757-10000223 Installed date not set | HP: 3 | Voltage: 230/460 Next due: August 27, 2027

Fire booster pump. Pump nameplate: Grundfos CR5-9 A-B-A-E-HQQE, Ver PN-SN A-99916757-10000223, 60 Hz, RPM 3461, excl. motor 44 lb, hp(P2) 3, GPM 30.4, rotation CCW, H/Hmax 223/299 ft, pmax/tmax 232/248 PSI/F, P code P22410, assembled in Mexico. Motor nameplate: WEG model 99883243, MFG date 07 Nov 2023, SN 1091414988, Ph 3, Hz 60, frame 182/4TC, Duty Cont, Alt 1000 masl, Ins Cl F, IP55, Amb 40C, Design B, Code H, HP 3, V 230/460, A 7.34/3.67, SFA 8.44/4.22, SF 1.15, PF .87, RPM 3515, NEMA 86.5.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

Cooling Tower

Evapco Area: Penthouse Location not set Installed date not set Next due: No active PM

Schedules

No pump schedules are on file.

FP-1

Fairbanks Morse Area: Mechanical Room A-13 - L1 Mechanical Location not set Installed date not set Next due: August 27, 2027

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

FP-2

Fairbanks Morse Area: Mechanical Room A-13 - L1 Mechanical Location not set Installed date not set Next due: August 27, 2027

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

HWP-06

Paco Area: Boiler Room Location not set Installed date not set Next due: No active PM

B119.16.HWP.06

Schedules

No pump schedules are on file.

HWP-17

Paco Area: Boiler Room Location not set Installed date not set Next due: No active PM

B119.16.HWP.17

Schedules

No pump schedules are on file.

HWP-18

Paco Area: Boiler Room Location not set Installed date not set Next due: No active PM

B119.16.HWP.18

Schedules

No pump schedules are on file.

P-1

Goulds Area: Mechanical Room A-13 - L1 Mechanical Location not set Installed date not set Next due: August 27, 2027

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-10

Paco | PACO | Condenser water pump Area: Floor 9 Mechanical Room Location not set | Serial: B2LZAHP09424 Installed date not set | HP: 7.5 | Voltage: 230/460 Next due: August 27, 2027

B119 CWP.10. Condenser water pump around/back corner. Disconnect. Lovejoy L100 coupling OK. PM note: L3 has higher amp draw.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-12

Sulzer | PACO | Chiller 6 pump Area: Floor 9 Mechanical Room Location not set | Serial: 61575401A Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 6 pump. B119.9 CHWP12 MCC A Bucket 03 VFD #7. Noise pass. Couplings good - Lovejoy with wrap-around insert. Will need scheduled shutdown for panel and pump.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-13

Sulzer | PACO | Chiller 5 pump Area: Floor 9 Mechanical Room Location not set | Serial: 61575402A Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 5 pump. Disconnect. Needs new coupling insert. Schedule to run for PMs.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-14

Sulzer | PACO | Chiller 6 pump Area: Floor 9 Mechanical Room Location not set | Serial: 61575401B Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 6 pump. B119.9 CHWP14 MCC A Bucket 04 VFD. Noise pass. Couplings good - Lovejoy with wrap-around insert. Will need scheduled shutdown for panel and pump.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-15

Sulzer | PACO | Chiller 5 pump Area: Floor 9 Mechanical Room Location not set | Serial: 61575402B Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 5 pump. Disconnect. Needs new coupling insert. Lower bearing noise at motor - greased. Lots of vibration.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-2

Goulds Area: Mechanical Room A-13 - L1 Mechanical Location not set Installed date not set Next due: August 27, 2027

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-21

Paco | PACO | Condenser water pump Area: 10SWM 10th Floor Mechanical Room Location not set | Serial: B2LMTFP10559A Installed date not set Next due: August 27, 2027

B119 CWP.21 SMCC 9D. Pump and motor profile partially visible in notes; only clear fields entered.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-22

Paco | PACO | Condenser water pump Area: 10SWM 10th Floor Mechanical Room Location not set Installed date not set | HP: 10 | Voltage: 230/460 Next due: August 27, 2027

B119 CWP.22 SMCC 9D Bucket #17. Coupling FAIL: coupling beat on; alignment bad. All pumps need new supports on discharge piping.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-23

Berkley | B 1-1/2 ERL | Condenser water pump Area: 10SWM 10th Floor Mechanical Room Location not set Installed date not set | HP: 7.5 | Voltage: 208-230/460 Next due: August 27, 2027

10SWM 10th floor mechanical room; stairwell access. B119 CWP.23 SMCC 9D Bucket #19. Serves 11th floor telecom room; also 2nd floor pumps. Coupling Lovejoy flex; TJE pass; noise pass. Sound good.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-26

Bell & Gossett | 1510 1-1/2 BC | Heat recovery pump Area: Floor 9 Mechanical Room Location not set | Serial: 2175795-1D Installed date not set | HP: 5 | Voltage: 230/460 Next due: August 27, 2027

Heat recovery system. Pump locked out; coupling insert is broke. Motor and pump should have all bearings replaced due to very poor alignment; note says this caused the failure.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-27

Bell & Gossett | BELL & GOSSETT | Heat recovery pump Area: Floor 9 Mechanical Room Location not set | Serial: 2175794 Installed date not set Next due: August 27, 2027

Heat recovery system. Not running during PM. Sister pump to heat recovery pumps; only clear serial/pressure readings entered.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-28

Bell & Gossett | 9.250 | Heat recovery pump Area: Floor 9 Mechanical Room Location not set | Serial: 2175789 Installed date not set | HP: 5 | Voltage: 230/460 Next due: August 27, 2027

Heat recovery system. Not running during PM.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

Pump 1

Area: Floor 2 Mechanical Room - 208 Location not set Installed date not set Next due: No active PM

Domestic booster system. Possible different floors.

Schedules

No pump schedules are on file.

Pump 2

Area: Floor 2 Mechanical Room - 208 Location not set Installed date not set Next due: No active PM

Domestic booster system. Possible different floors.

Schedules

No pump schedules are on file.