Floor 9 Mechanical Room

Multnomah County area detail.

Floor 9 Mechanical Room

Building: Justice Center - Multnomah County Detention Center (MCDC)

1120 SW 3rd Ave | Portland, OR 97204-2828

Assigned Pumps

8

Area Order

4

Area Pumps

P-10

Paco | PACO | Condenser water pump Location not set | Serial: B2LZAHP09424 Installed date not set | HP: 7.5 | Voltage: 230/460 Next due: August 27, 2027

B119 CWP.10. Condenser water pump around/back corner. Disconnect. Lovejoy L100 coupling OK. PM note: L3 has higher amp draw.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-12

Sulzer | PACO | Chiller 6 pump Location not set | Serial: 61575401A Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 6 pump. B119.9 CHWP12 MCC A Bucket 03 VFD #7. Noise pass. Couplings good - Lovejoy with wrap-around insert. Will need scheduled shutdown for panel and pump.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-13

Sulzer | PACO | Chiller 5 pump Location not set | Serial: 61575402A Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 5 pump. Disconnect. Needs new coupling insert. Schedule to run for PMs.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-14

Sulzer | PACO | Chiller 6 pump Location not set | Serial: 61575401B Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 6 pump. B119.9 CHWP14 MCC A Bucket 04 VFD. Noise pass. Couplings good - Lovejoy with wrap-around insert. Will need scheduled shutdown for panel and pump.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-15

Sulzer | PACO | Chiller 5 pump Location not set | Serial: 61575402B Installed date not set | HP: 30 | Voltage: 230/460 Next due: August 27, 2027

Chiller 5 pump. Disconnect. Needs new coupling insert. Lower bearing noise at motor - greased. Lots of vibration.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-26

Bell & Gossett | 1510 1-1/2 BC | Heat recovery pump Location not set | Serial: 2175795-1D Installed date not set | HP: 5 | Voltage: 230/460 Next due: August 27, 2027

Heat recovery system. Pump locked out; coupling insert is broke. Motor and pump should have all bearings replaced due to very poor alignment; note says this caused the failure.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-27

Bell & Gossett | BELL & GOSSETT | Heat recovery pump Location not set | Serial: 2175794 Installed date not set Next due: August 27, 2027

Heat recovery system. Not running during PM. Sister pump to heat recovery pumps; only clear serial/pressure readings entered.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026

P-28

Bell & Gossett | 9.250 | Heat recovery pump Location not set | Serial: 2175789 Installed date not set | HP: 5 | Voltage: 230/460 Next due: August 27, 2027

Heat recovery system. Not running during PM.

Schedules

Every 12 month(s)

Upcoming
Next due: August 27, 2027 Completed | August 27, 2026 | completed August 27, 2026