Preventative Maintenance Record
Technician Notes
PM was not able to be fully completed because the pump was locked out, the coupling insert is broken, and the system could not be turned off for proper testing. Motor and pump should have all bearings replaced due to very poor alignment; note says this caused the failure.
Readings
| Reading | Point A | Point B | Point C | Point D | Point E | Point F | Point G | Point H |
|---|---|---|---|---|---|---|---|---|
| Mils | ||||||||
| In/sec | ||||||||
| G's Peak | ||||||||
| Temp |
| RPM at shaft | |
|---|---|
| Ambient Temp. | |
| Amps | |
| Volts | 476 / 479 / 478 |
| Meg (resistance) | |
| Hours (runtime) | |
| Inlet pressure | 17 |
| Discharge pressure | N/A |
| Noise | Fail (see notes) |
| Controller Temp |
Pump Information
Bell & Gossett Heat recovery pump
model 1510, 1-1/2 BC, 9000 BF
ser 2175795
ID No. D99
GPM 126
TDH 81
model 1510, 1-1/2 BC, 9000 BF
ser 2175795
ID No. D99
GPM 126
TDH 81
Motor Information
Marathon E719 5VE184TTDB4028ANX HP 5 V 230/460 A 12.4/6.2 RPM 1800 frame 184T Hz 60 enc DP Motor type TDR; insulation B2; des B; eff 87.5%; perf 85.5%; SF 1.15; code J; duty cont.
Controller Information
Disconnect
Valve Information
Suction and discharge isolation